{"id":9805,"date":"2022-11-20T19:19:34","date_gmt":"2022-11-21T03:19:34","guid":{"rendered":"https:\/\/www.lee.org\/blog\/?p=9805"},"modified":"2022-11-20T19:19:34","modified_gmt":"2022-11-21T03:19:34","slug":"iso-manufacturing-and-order-tracking-system","status":"publish","type":"post","link":"https:\/\/www.lee.org\/blog\/2022\/11\/20\/iso-manufacturing-and-order-tracking-system\/","title":{"rendered":"ISO Manufacturing And Order Tracking System"},"content":{"rendered":"<p>Can you help me find a manufacturing and order tracking system for my organization? We&#8217;ve got several projects (including the cool art coasters below) that are being designed and manufactured in-house by our students. I expect we&#8217;ll have sales of something like 5-20 items per day. Any thoughts?<\/p>\n<p>I&#8217;m the Production Lead at Autistry Studios, a day program for autistic adults working toward independence!<br \/>\n<a class=\"x1fey0fg xmper1u x1edh9d7\" href=\"http:\/\/autistry.com\/\">http:\/\/autistry.com\/<\/a><\/p>\n<p><a href=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-9806\" src=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-600x331.jpg\" alt=\"\" width=\"600\" height=\"331\" srcset=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-600x331.jpg 600w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-300x165.jpg 300w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-120x66.jpg 120w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-768x423.jpg 768w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-1536x847.jpg 1536w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356-50x28.jpg 50w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2022\/11\/PXL_20221108_213825356.jpg 1544w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Can you help me find a manufacturing and order tracking system for my organization? We&#8217;ve got several projects (including the cool art coasters below) that are being designed and manufactured in-house by our students. I expect we&#8217;ll have sales of something like 5-20 items per day. Any thoughts? I&#8217;m the Production Lead at Autistry Studios, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9805","post","type-post","status-publish","format-standard","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts\/9805","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/comments?post=9805"}],"version-history":[{"count":1,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts\/9805\/revisions"}],"predecessor-version":[{"id":9807,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts\/9805\/revisions\/9807"}],"wp:attachment":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/media?parent=9805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/categories?post=9805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/tags?post=9805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}