{"id":6575,"date":"2013-11-28T00:49:25","date_gmt":"2013-11-28T08:49:25","guid":{"rendered":"http:\/\/www.lee.org\/blog\/?p=6575"},"modified":"2013-11-27T01:41:49","modified_gmt":"2013-11-27T09:41:49","slug":"repaving-24th-street","status":"publish","type":"post","link":"https:\/\/www.lee.org\/blog\/2013\/11\/28\/repaving-24th-street\/","title":{"rendered":"Repaving 24th Street"},"content":{"rendered":"<p>It&#8217;s fun seeing the bones of the neighborhood slowly change.<\/p>\n<p>24th Street was repaved on August 23rd, 2013. Here are some photos<\/p>\n<p><a href=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4-337x600.jpg\" alt=\"\" width=\"337\" height=\"600\" class=\"alignnone size-large wp-image-6580\" srcset=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4-337x600.jpg 337w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4-112x200.jpg 112w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4-168x300.jpg 168w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4-28x50.jpg 28w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-4.jpg 1440w\" sizes=\"auto, (max-width: 337px) 100vw, 337px\" \/><\/a><br \/>\nI don&#8217;t know why they dug up this section all the way to dirt. They later filled it with concrete and then repaved it in asphalt. It&#8217;s interesting to see that there isn&#8217;t any gravel and the concrete is only about 6 inches deep. That&#8217;s not the best road construction but it&#8217;ll do well enough.<\/p>\n<p><a href=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-1-8-23-13.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-1-8-23-13-600x337.jpg\" alt=\"\" width=\"600\" height=\"337\" class=\"alignnone size-large wp-image-6576\" srcset=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-1-8-23-13-600x337.jpg 600w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-1-8-23-13-200x112.jpg 200w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-1-8-23-13-300x168.jpg 300w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-1-8-23-13-50x28.jpg 50w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><br \/>\nI love the asphalt Zamboni!<\/p>\n<p><a href=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-2.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-2-600x337.jpg\" alt=\"\" width=\"600\" height=\"337\" class=\"alignnone size-large wp-image-6577\" srcset=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-2-600x337.jpg 600w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-2-200x112.jpg 200w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-2-300x168.jpg 300w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-2-50x28.jpg 50w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-3.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-3-600x337.jpg\" alt=\"\" width=\"600\" height=\"337\" class=\"alignnone size-large wp-image-6578\" srcset=\"https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-3-600x337.jpg 600w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-3-200x112.jpg 200w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-3-300x168.jpg 300w, https:\/\/www.lee.org\/blog\/wp-content\/uploads\/2013\/11\/repaving-24th-street-3-50x28.jpg 50w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><br \/>\nLive Action Bob the Builder<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s fun seeing the bones of the neighborhood slowly change. 24th Street was repaved on August 23rd, 2013. Here are some photos I don&#8217;t know why they dug up this section all the way to dirt. They later filled it with concrete and then repaved it in asphalt. It&#8217;s interesting to see that there isn&#8217;t [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6578,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6575","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts\/6575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/comments?post=6575"}],"version-history":[{"count":0,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/posts\/6575\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/media\/6578"}],"wp:attachment":[{"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/media?parent=6575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/categories?post=6575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lee.org\/blog\/wp-json\/wp\/v2\/tags?post=6575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}